![Connecticut Ave](/sites/ccida.com/files/styles/medium/public/2022-06/IMG_1112%20%281%29.jpg?itok=aJOipk_d)
The project consists of the design and new construction of an approximate 60,000 sq. ft pre-engineered insulated metal building with a new HVAC system, propane generator, parking lot for 77 spaces and storm water management improvements located on the premises. The proposed tenant is SteRx who is a manufacturer of sterile liquid pharmaceuticals. This project broke ground on June 29, 2021 and is still being completed.